Installing ceiling enclosures above the fume hood, Installing additional service fixtures – Labconco Protector Pass-Through Laboratory Fume Hoods 1136 Series Manuel d'utilisation

Page 36

Advertising
background image

Chapter 7: Modifying Your Protector Pass-Through

Product Service 1-800-522-7658

32

Original instructions

Installing Ceiling Enclosures Above the

Fume Hood

Your Protector Fume Hood has mounting holes to accept a ceiling enclosure to
close off the area between the top of the hood and the ceiling. Contact Labconco
Customer Service for ordering information. Ceiling Enclosures for Pass-Through
Hoods are handled as a specials request.













Figure 7-2

Installing Additional Service Fixtures

Additional service fixtures can be installed in the available service fixture holes in
both sidewalls and corner posts. The fume hood is factory set to accept up to four
valves per side. Contact Labconco Customer Service for information.









9827900

Cold Water Gooseneck, any position

9571000

Service Fixture CW, lower right, Pos. 1

9571001

Service Fixture CW, mid-lower right, Pos. 2

9571002

Service Fixture CW, mid-upper right, Pos. 3

9571003

Service Fixture CW, upper right, Pos. 4

9571004

Service Fixture CW, lower left, Pos. 1

9571005

Service Fixture CW, mid-lower left, Pos. 2

9571006

Service Fixture CW, mid-upper left, Pos. 3

9571007

Service Fixture CW, upper left, Pos. 4

9571100

Service Fixture GAS, lower right, Pos. 1

Figure 7-5 – Hose Connector

Figure 7-3 - Knob

Figure 7-4 - Valve

Advertising