07 connecting torch leads, 07 connecting torch leads -4 – Tweco 100XL Plus CE PAK Master Manuel d'utilisation

Page 20

Advertising
background image

INSTALLATION

3-4

Manual 0-2813

3.07 Connecting Torch Leads

A. Connecting PCM-102 Torch or SL100 torch

with O2B Connectors

WARNING

Disconnect primary power at the source before
assembling or disassembling the power supply,
torch parts, or torch and leads assemblies.

The Torch Leads must be properly installed to the Power Sup-
ply for proper operation. Make all torch connections to the
Torch Bulkhead Panel as follows:

NOTE

Equipment ordered as a system will have the Torch
factory connected to the Power Supply.

1. Turn the screw latch securing the front access

panel to the power supply front panel.

Access
Panel

Screw
Latch

A-02467

Figure 3-3 Front Access Panel

2. Lift the access panel to gain access to the torch

bulkhead panel.

CAUTION

This system is designed for use with the PCM-102
Automated Torch or SL100 Torch only. Do not con-
nect any other torch to this power supply.

3. Remove the retaining nut from the Strain Relief.

Strain Relief
Nut

Strain Relief

Torch Leads
Assembly

A-02760

Figure 3-4 Torch Strain Relief Nut (PCM-102 Torch

Shown)

4. Feed the end of the torch lead and the Strain Relief into

the hole in the unit.

5. Tighten the Strain Relief Nut to secure the Strain

Relief to the Power Supply.

Adapter

(Supplied With
Power Supply)

Pilot Lead

Torch Lead

Assembly

Gas/Power

Lead

Adapter

Connector

Pilot Lead Stud

Gas/Power Lead

Connection

A-02747

PIP Circuit &

Shield Connectors

Figure 3-5 Torch Leads Connections (PCM-102

Torch Installation)

Advertising