Warning – Samlex America SCC-30AB Manuel d'utilisation

Page 30

Advertising
background image

30

4

PRINCIPLE OF OPERATION & FEATuREs

will be less than the programmed Equalization Voltage Set Point displayed on
Screen 6 (Fig 5.3) under “EQU”.

NOTE: Although the charger is in Bulk Stage, the LCD Screen 4 (Fig 5.3) displays “State:

Equalization” and NOT “State: Bulk.”

The Status LED will be steady Orange.
Stage - 2: Equalization Stage. The controller enters this stage at point “C1” from
the previous Bulk Stage when the battery voltage reaches the Equalization Voltage
Regulation Set Point “Ve” and is sustained for a minimum period of around 50 to
55 sec. This stage is timed for continuous / cumulative period of 1/2/3 Hours based
on the programmed type of battery (Please see Table 6.1 under heading “Standard
Battery Charging Programs” on page 43). During the Equalization period (Curve
portion C1 to D1), the battery is in overcharge condition, is gassing and bubbling
vigorously and the electrolyte gets stirred up resulting in removal of stratification.
Also, weaker cells are brought up to full charge too (equalized).
In this stage, the Switch operates under PWM control by feeding pulsing Short Circuit
Current “Isc” with constantly reducing Duty Cycle (< 100% and > 0%) / average current
to keep the battery voltage constant at the Equalization Voltage Regulation Set Point
“Ve” (Curve portion C1 to D1). This is equivalent to Constant Voltage Charging. This is
an intentional, controlled over charge condition for the battery for 1/2/3 Hrs.
Change over to the next Float Voltage Regulation Set Point “Vf” is possible only
after the battery voltage is held at the selected Equalization Voltage Regulation
Set Point “Ve” for continuous or cumulative period of 1/2/3 Hours depending upon
the programmed type of battery (Please see Table 6.1 under heading “Standard
Battery Charging Programs” on page 43). If “Ve” cannot be maintained continuously
/ cumulatively for 1/2/3 Hrs, the charger will NOT exit out of Equalization Stage and
transition to Float Stage will NOT take place.
During this stage, LCD Screen 4 (Fig 5.3) displays “ State: Equalization”. LCD Screen 6
(Fig 5.3) displays the programmed Equalization parameters. Screen 1 (Fig 5.3) shows
the programmed value of Equalization Voltage Regulation Set Point “Ve” under
“BatV”.
The Status LED on the front panel will be steady Orange

NOTE: During Equalization Stage, if the load current is more than the current from the solar

panel, the battery voltage will drop. If the battery voltage drops around 1V below the

Equalization Transition Voltage Set Point “Ve” for around 1 min, the controller reverts to Bulk

Stage with 100% Duty Cycle. The LCD Screen 4 (Fig 5.3) will still display “State: Equalization”

and the front panel Status LED will still be steady Orange. It will revert to PWM when the

battery voltage reaches Equalization Transition Voltage Set Point “Ve” and is sustained for a

minimum period of around 50 to 55 sec.

WARNING!

Once Equalization Stage is activated, it will not exit this Stage unless the there is adequate

charging current from the solar panel to charge the battery up to the programmed Equalization

Advertising