INSTALLATION

3-4

Manual 0-2811

L1

L2

L3

Input
Contactor

AC Input
Power Cable

GND

Unused Jumper
L3 to L3 (storage)

A-02670

Figure 3-5 Primary Power Cable Connections -

Three-Phase Operation

Single-Phase Operation

Single-phase operation requires a 2-conductor cable
with ground.

a. Locate the single-phase jumper wire connected

between the two L3 terminal lugs on the in-
put contactor.

b. Move one end of the jumper wire from termi-

nal lug L3 to L2 at the contactor.

NOTE

The jumper wire from L1 to L4 must not be re-
moved.

Single Phase

Jumper Wire

(L2 to L3)

Input Contactor

A-00914

L3

L2

Figure 3-6 Single Phase Jumper Wire Installation

c. Locate the ground stud and remove the top

nut and washer.

d. Install a lug terminal on the ground wire.

e. Place the ground wire onto the ground stud

and secure with the nut and washer.

f. Insert the other two wires into the L1 and L2

terminals on the contactor.

g. Tighten all set screws even the ones not used.

AC Input

Power Cable

L1

L2

GND

Input Contactor

A-00915

Figure 3-7 Primary Power Cable Connections -

Single-Phase Operation

3.08 Gas Connections

A. Gas Requirements

WARNING

This unit not to be used with oxygen (O

2

).

Gases: Compressed Air or Nitrogen (N

2

) Only

Pressure:

70 psi (4.8 bar)

CAUTION

Maximum input gas pressure must not exceed 125
psi (8.6 bar)

Flow:

Cutting - 400 scfh (188.7 lpm)

Gouging - 400 scfh (188.7 lpm)