Manual No. 0-4816 Auto-Cut 200

2

3-35

INSTALLATION

3. Connect the gas supply lines and the control cable connector from the Gas Control Module to the Valve Kit as

shown. Hold the check valves stationary while attaching the gas lines.

Control Cable Connector

Plasma Gas Inlet

Preflow Gas Inlet

Shield Gas Inlet

Water Shield Inlet

Art # A-06926

Torch Valve, Inlet Side

Hold all fittings stationary while attaching hoses or leaks can be created. Side pressure can break the check valves
or weaken their connection to the torch valve assembly. All fittings must be checked for leaks after assembly.

3.18 Prepare the Torch Head

1. Remove and discard the jumper on the torch head, as shown.

Jumper

Art # A-07323

1

2

Discard

4

3