Glue – Flint & Walling CPH Convertible Manuel d'utilisation

Page 6

Advertising
background image

10

11

4b. For driven wells, a check valve is required

at the top of the well to maintain prime. Flow

arrow must point toward pump.

(

Fig. 4b)

IL1475

Pump

Flow Arrow

4b

WELL TO PUMP CONNECTION (SUCTION PIPE)

2

IL1395

Tape

1

2. Finish the connection to your well with

additional pipe and fittings as needed.

(Fig. 2)

1. Make the connection to your well. Wrap all

threaded fittings with pipe tape 5 times or

apply a pipe paste (pipe dope) to ensure an

air tight connection. (Fig. 1)

Deep Well Application Only:

PUMP TO PRESSURE TANK CONNECTION (DISCHARGE PIPE)

Shallow Well Application Only:

1. Begin the connection to the pressure tank.

Using a 3/4 in. x 3 in. galvanized nipple,

wrap the threads 5 times with pipe tape and

apply pipe paste (pipe dope) and install in

top of pump. (

Fig. 1)

NOTE: 1 and 1-1/2 HP models will require 1 in.

discharge fittings in place of 3/4 in. discharge

fittings throughout these steps.

IL1397

1

2

3

3. Install a 3/4 in. MPT x 1/4 in. FPT galvanized

bushing and pressure gauge (optional), or a

pipe plug. Do not tighten, as you will prime

your pump later at this location. (

Fig. 3)

2. Install a 3/4 x 3/4 x 3/4 in. galvanized tee

fitting. (

Fig. 2)

IL1397

5

5. Finish the connection to your well with

additional pipe and fittings as needed.

(

Fig. 5)

4. Continue with fittings and pipe to the

pressure tank. A 3/4 in. union (optional) for

easy connection and disconnection. (

Fig. 4)

Glue

4

Advertising
Ce manuel est liée aux produits suivants: