Suggested inspection openings

450mm x 450mm (18" x 18")

(Combustible material)

External wall,
combustible material

• Inspection openings are suggested for the vent intake and exhaust

pipes if they are installed in an enclosure. These openings should be
near the entrance and exit of the vent into the enclosure.

• These openings should be 450mm x 450mm (18" x 18").

When the vent pipe passes through an enclosed space:

Ceiling

Sloping down toward vent terminal

Vertical Vent Termination

• Terminate at least 1.8m (6') from the combustion

air intake of any appliance, and 0.9m (3') from
any other building opening, gas utility meter,
service regulator etc.

• Enclose exterior vent systems below the roof

line to limit condensation and protect against
mechanical failure.

• When the vent penetrates a floor or ceiling and

is not running in a fire rated shaft, a firestop
and support is required.

• When the vent termination is located not less

than 2.4m (8') from a vertical wall or similar ob-
struction, terminate above the roof at least 0.6m
(2'), but not more than 1.8m (6'), in accordance
with the National Fuel Gas Code ANSI Z223.1/
NFPA 54 and/or CSA-B149.1.

• Provide vertical support every 2.1m (').

• Slope the horizontal vent 1/4" for every 300mm

(12") towards the drain tee.

• The integrated condensate collector must be

used for vertical runs in excess of 0.9m (3').
Remove the cap prior to attaching the drain tubing.

• When 2 units are installed in a Quick Connect

Multi System, maintain a minimum distance of
1.5m (5') between the vertical terminations.

Firestop

Firestop/

Support

Roof Flashing

(Base and Adapter)

Air Intake

Pipe

Rain

Cap

5' or more

Hanger

Strap

Elbow

Slope vent

Upwards

* Condensate collector
must be used if the
vertical run exceeds

0.9m (3').

Drain condensate

according to

local codes.