Installing gas supply, 3. installing gas supply – Miller Electric HF-251D-1 Manuel d'utilisation

Page 14

Advertising
background image

OM-611 Page 10

Return To Table Of Contents

Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.

1

Cap

2

Cylinder Valve

Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.

3

Cylinder

4

Regulator/Flowmeter

Install so face is vertical.

5

Gas Hose Connection

Fitting has 5/8-18 right-hand
threads.

6

Flow Adjust

Typical flow rate is 15 cfh (cubic feet
per hour).

Make sure flow adjust is closed
when opening cylinder to avoid
damage to the flowmeter.

7

Gas In Fitting

8

Gas Out Fitting

Open left side panel.

The Gas In and Gas Out fittings
have 5/8-18 right-hand threads.
Obtain proper size, type, and length
hose and make connections as fol-
lows:

Connect hose from shielding gas
supply regulator/flowmeter to Gas
In fitting.

Connect shielding gas hose from
torch to Gas Out fitting.

Close left side panel.

ssb3.3* 5/94 − Ref. 158 697-A / Ref. 098 956-B

Tools Needed:

1-1/8, 5/8 in

1

2

3

4

5

6

7

8

To Torch

Argon Gas

IN-GAS-OUT

3-3.

Installing Gas Supply

Advertising
Ce manuel est liée aux produits suivants: