Installation instructions, Step 4 -insert drain pump – GE ZDIS150ZSS Manuel d'utilisation

Page 14

Advertising
background image

14

Installation Instructions

Install the new drain tube with the new 7/8” clamps.

1. Place rear cover against the back of the ice

machine. Route the vent tube, power cord, drain

tube, and water supply line through cut outs in

the rear cover.

2. Secure rear cover with original screws.

Attach vent tube to unit with clamps as shown.

3. Trim one end of hose at 3/4” diameter. Secure

5/8” diameter section to pump with 7/8”

adjustable hose clamp

4. Route drain tube to house drain.

STEP 5 - INSTALL BIN DRAIN TUBE

STEP 6 - SECURE VENT TUBE

NOTE: While performing installations described in this

book, safety glasses or goggles should be worn.
NOTE: Product improvement is a continuing endeavor at

General Electric. Therefore, materials, appearance and

specifications are subject to change without notice.

7/8”Adjustable

Hose Clamp

Water Supply

Vent

Tube

1/2” Drain tube

Power Cord

Clamps and Screws

New 5/8” Drain Tube

New 7/8” Adjustable

Hose Clamp Installed

1. Carefully slide the auxiliary drain pump into the

bottom of the ice machine. The tab on the back of

the pump should slip into the rectangular slot on

the ice machine floor. It may be necessary to tip

the pump slightly to engage the tab.

NOTE: The pump must be in position before

connecting the bin drain tube. Slide pump tab into

floor slot in the bottom of the cabinet. See Step 5.

2. Secure the pump to the base with the 2 supplied

screws.

STEP 4 -INSERT DRAIN PUMP

Mounting Tab Slot

Pump Mounting Screws

Advertising
Ce manuel est liée aux produits suivants: