Installation instructions, Step 1 - remove original parts, Step 2 - connect electrical – GE ZDIS150ZSS Manuel d'utilisation

Page 13: Step 3 -install new tubing

Advertising
background image

13

1. 8QSOXJSRZHUFRUGIURPUHDUFRYHU

2. Remove screws holding the rear cover. Retain

screws. Carefully pull rear cover away from drain

tube.

3. Remove old drain tube and clamp attached to bin.

Discard the tube and clamp.

Installation Instructions

STEP 1 - REMOVE ORIGINAL PARTS

Old Drain Hose

Clamp

Old Drain Tube

Remove Screws

NOTE: If pump is being installed on a ice maker that

has not been completely installed, please proceed

to Drain Pump Install section.

1. Attach vent tube to pump with new 5/8” hose

clamp. Attach drain tube from bin to pump with

7/8” hose clamp.

2. Coil ice machine power cord into a 4” dia. coil and

secure with electrical tape. Place the coil onto the

top of the pump.

1. Position pump at the right side, just outside of the opening.

2. Plug the ice machine power cord into the front of

the pump.

STEP 2 - CONNECT ELECTRICAL

Pump Power Cord

Ice

machine

Power

Cord

STEP 3 -INSTALL NEW TUBING

Plug Ice machine

Power Cord into

Pump

New 7/8”
Adjustable
Hose
Clamp

Vent Tube

5/8”Adjustable

Hose Clamp

Advertising
Ce manuel est liée aux produits suivants: