Installation instructions, Caution, Connect ductwork – GE JV936DSS Manuel d'utilisation

Page 15: Install ceiling bracket

Advertising
background image

CONNECT DUCTWORK

• Push duct over the end of the transition until it

reaches the stop tabs.
• Install ductwork, making connections in direction of

airflow as illustrated.

• Secure joints in ductwork with sheetmetal screws.
• Wrap all duct joints with duct tape for an airlight seal.
• Use duct tape to seal the flange connection

CAUTION:

Do not use sheet metal screws

at the transition to ductwork connection. Doing se will

prevent proper damper operations. Seal connection with

tape only.

Duct Stops

Duct Tape Over

Seam and Screw

Duct Tape Only for Proper

Operation of Damper

Duct Tape Over

Flange

Air Flow

Screw

House

Ductwork

Ductwork

Transition

15

INSTALL CEILING BRACKET

The ceiling bracket must be installed when the duct

cover is used to span 24” or more height above the hood.

The bracket will hold the decorative duct cover in place

at the top.
Note: The ceilling bracket is not required when using only

the 12” section of the duct cover.
• Install the 2 small screws into the sides of the duct

bracket. remove the screws. Pre-tapping the holes will

insue ease of final installation.
• Match center notch on the bracket to the centerline

on the wall and flush against the ceiling.

• Mark the 2 screw hole locations.
• Drill 2/8” pilot holes in marked bracket location.
• If pilot holes do not enterstuds, enlarge the holes to

3/8” and install wall fastener anchors.

• Secure the bracket to the rear wall with wood screws

and washers. Use wall anchors if needed.

Note: Bracket has 2 sets of holes. Use larger holes

for wall fasheners or wood screws with washers. Use

smaller holes for wood screws with washers.

5

Install Ceiling
Bracket When
Duct Cover is
Used to Span 24”
or more

See Step
9 to Install
Duct
Cover.

6

Installation Instructions

Advertising
Ce manuel est liée aux produits suivants: