Installation instructions, Determine hood, ductwork and wiring locations, House wiring location – GE JV936DSS Manuel d'utilisation

Page 12

Advertising
background image

12

• Keep the wood support piece and its screws for later

installaton. Do not discard.

• Measure desired distance from the bottom of the hood

to the cooking surface, 24” min. to 36” max. Refer to the

previous page if the accessory duct cover will be used.

• Use a level to draw a horizontal line indicating the bottom

of the hood.

• Use a level to draw the cooktop centerline location.
• Measure 15-3/8” up from the horizontal lline for the

bottom of the hood. Draw another horizontal line.

• Measure 18” up from the line for the bottom of the hood,

draw another horizontal line to indicate the top of the

hood.

FOR VERTICAL (Straight Up) DUCTING:
• If venting out the ceiling, extend the centerline forward on

the ceiling.
- Measure 6-7/8” from drywall to mark centerline for a

7-1/2” dia. duct hole on the ceiling.

- If drywall is not present, add drywall thickness to the

6-7/8” dimension.

Venting through a soffit or upper cabinet:
• Follow the same procedure for ceiling ducting to cut the

7-1/2” dia. hole through the top of the cabinet or soffit.

• See Step 4, page 15 for details to cut opening for duct

transition.

House Wiring Location:

• The junction box is fastenend to the back of the hood

on the right side. See illustrations for hood knockout

locations.

Note:The junction box can be relocated to the inside top of

the hood.
House wiring may enter the junction box from the rear or

the top of the hood at the right side.
To route house wiring through the ceiling or soffit:
– Cut a hole approximately 1” dia., 5-7/8” forward on

the ceiling; 11-1/8” to the right of the centerline for 30”

models or 14-1/8” to the right of the centerline for 36”

models.

To route house wiring through the wall:
– Cut a hole approximately 1” dia. 10-1/16” down from the

top of the hood, 11-1/8” to the right of the centerline for

30” models or 14-1/8” to the right of the centerline for 36”

models..

• Remove top or rear knockout depending on your

installation.

• Install strain relief onto back or top of hood.

FOR DUCTING THROUGH REAR WALL:
• Measure the supplied duct transition with any straight

run length of duct used, plus 90” elbow height. Draw a

horizontal line on the wall intersecting the centerline.

DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS

5-7/8”

10-1/16”

Knockout
Locations

14-1/8” for 36” Models
11-1/8” for 30” Models

14-1/8” for 36” Models
11-1/8” for 30” Models

Installation Instructions

6-7/8”

Centerline to Wall

FOR CEILING

VENT DUCTING

FOR WALL VENT DUCT

7-1/2” Dia.

Hole

Electrical

Electrical

Top of Hood

Centerline 8” Min.

above Top of

Hood

18”

Wood

Support

15-3/8”

Bottom of Hood

Advertising
Ce manuel est liée aux produits suivants: