Aquascape IonGen Generation 1.5 (95013) Manuel d'utilisation

Page 3

Advertising
background image

3

1. Mount the IonGen

Control Panel

Mount the IonGen

Control Panel

in the desired location, making

sure the electrical cord reaches

the GFI outlet. The Control Panel

is weather resistant, but steps to

protect it from the elements, such

as mounting the panel above

the ground, are recommended to

maximize its lifespan.

(See Fig. 1)

2. Install the Flow

Chamber

The PVC Flow Chamber for the

IonGen

can be located in

several areas within the water

feature. The Flow Chamber is

most effective when plumbed

directly into the water feature’s

recirculating system. The

Flow Chamber can also be

submerged in a region of the

water feature with a good

water flow, such as in

a skimmer box or the edge

of a stream/waterfall. Make

sure the electrical cord for the

Probe reaches the Flow Chamber

location. Follow the step-by-step

installation instructions for the

method you select.

Note: The PVC Flow Chamber is

a standard 2-inch schd 40 PVC

slip connection and can be made

using PVC glue. Other fittings

(not included) can be used to

convert the Flow Chamber to

fit the specific application

requirements.

Flow Chamber Option A:

Plumb directly into

recirculating system

Cut and insert the PVC Flow

Chamber into the water

feature’s recirculating system.

The Flow Chamber should be

positioned after the water

feature’s pump and in a

region of the plumbing line

that will drain for servicing

the replaceable Probe and

overwintering the fitting. It is

recommended to use a pre-

filter, such as a skimmer, prior

to the Flow Chamber in order

to remove solids and debris

that may interfere with the

Probe. A small valve box may

be used for easy access during

maintenance.

(See Fig. 2)

• Glue the PVC Flow Chamber into

position using PVC glue (not

included). Follow the glue

manufacturer’s directions

for proper steps.

(See Fig. 3)

• Install the Probe into the top of

Flow Chamber. Use Teflon tape

or a bead of silicone (not

included) over the threads of the

Probe fitting to ensure a water

tight seal. The threads on the

probe are tapered and are not de-

signed to thread completely down

into the Flow Chamber. Install

the probe into the Flow Chamber

hand tight and then one or two

additional turns with a wrench.

Fig. 1 Mount the IonGen

Control Panel

in the desired location.

• Read the Installation Instruction

& Maintenance Owner’s Manual

before installing.

• Follow all local codes for

installation.

• To reduce the risk of electric

shock, connect only to a

properly grounded, ground fault

interrupter (GFI).

• Do not immerse the Control

Box in water.

Safety Instructions

Step-by-Step Installation for the IonGen

ImPOrTANT: Before starting

the IonGen

system on existing

water features it is recom-

mended to thoroughly clean

the pond of as much debris as

possible. This will maximize the

ion’s effectiveness, and speed

to achieve desired results. The

more debris and dirtier the water

feature, the longer it will take

for the IonGen

to provide

noticeable results.

Fig. 2

Fig. 3

Fig. 4

Fig. 6

Fig. 5

Advertising