Operation of the proofer, Power failure – Doyon JAOP10 Manuel d'utilisation

Page 14

Advertising
background image

A-11

OPERATION OF THE PROOFER

1. Switch "ON" (1).

2. Set the thermostat control at 100

° F.

3. Set the humidity control at approximately:

3 for JAOP-3 & JAOP-6
4 or 5 for JAOP-10
5 for JAOP-14

4. If there is too much fog and water drips from the glass doors,

adjust humidity control to a lower number.

5. When the temperature is stabilised, put the products in the proofer.

(Leave them inside until they are ready to bake.)

6.

IMPORTANT:

When proofing cycle is completed, turn the

humidity switch to "OFF" and let the motor blower and air heat
element run for 10-15 minutes to let dry the proofer. Then, turn the
main switch ‘’OFF’’ (0) and leave the door ajar to prevent moulding.

When the proofer is not in operation, open the doors to let out the humidity and to prevent
mould.

P.S.

The doors should not be opened unnecessarily to conserve the heat and humidity in the proofer.

Every day cleaning of the water pan under the proofer's doors should be exercised.

POWER FAILURE

When the power comes back, the proofer will start automatically. Then it’s recommended to turn OFF
the unit to avoid it starting without supervision.

Advertising
Ce manuel est liée aux produits suivants: