Figure 4, Diesel application shown – Draw-Tite 50140 CUSTOM QUICK INSTALL BRACKETS Manuel d'utilisation
Page 6

z
2010 Cequent Towing Products, Inc. PCN 15243
Sheet 6 of 30
50140N
05/17/11
Rev. E
INSTALLATION FOR 30124 RAILS ONLY
FIGURE 4
VEHICLE
FORWARD
6
5
4
3
2
1
8
7
10
9
13
16
12
11
15
14
DIESEL
APPLICATION
SHOWN
#
DESCRIPTION
QTY.
#
DESCRIPTION
QTY.
1
FRAME BRACKET, FORWARD LH
1
9
TUBE SPACER, 1-1/4 in. LONG
2
2
FRAME BRACKET, REAR LH
1
10
SPACER 5 X 1-1/2 x 5/16 in.
2
3
FRAME BRACKET, FORWARD RH
1
11
U-BOLT, ½-13 x 7-3/4 x 4-1/2 in.
4
4
FRAME BRACKET, REAR RH
1
12
HEX NUT, 1/2-13 in.
9
5
CARRIAGE BOLT, 5/8-11 x 3-1/2 in.
2
13
CONICAL WASHER, ½ in.
9
6
CARRIAGE BOLT, 5/8-11 x 6 in.
2
14
NUT, 5/8-11 in.
4
7
TUBE SPACER, 4 in. LONG
2
15
CARRIAGE BOLT, 1/2-13 X 1-3/4 in.
1
8
CONICAL WASHER, 5/8 in.
4
16
BLOCK, 1 x 3 x 1/4 in.
1
Equipment Required:
Fastener Kit: 116629
Wrenches: 3/4, 7/8, 15/16
Drill Bits: 1/8 in., 9/16 in., 11/16 in.
Other Tools: Center Punch, Measuring Tape, 1-1/8 in. hole saw
PLEASE READ ALL INSTRUCTIONS BEFORE STARTING INSTALLATION
Drivers side
Passengers side
Inside frame
Some of the
fasteners
shown are
supplied with
the rail kit.