Figure 4, Diesel application shown – Draw-Tite 50140 CUSTOM QUICK INSTALL BRACKETS Manuel d'utilisation

Page 6

Advertising
background image

z

2010 Cequent Towing Products, Inc. PCN 15243

Sheet 6 of 30

50140N

05/17/11

Rev. E

INSTALLATION FOR 30124 RAILS ONLY

FIGURE 4

VEHICLE

FORWARD

6

5

4

3

2

1

8

7

10

9

13

16

12

11

15

14

DIESEL

APPLICATION

SHOWN

#

DESCRIPTION

QTY.

#

DESCRIPTION

QTY.

1

FRAME BRACKET, FORWARD LH

1

9

TUBE SPACER, 1-1/4 in. LONG

2

2

FRAME BRACKET, REAR LH

1

10

SPACER 5 X 1-1/2 x 5/16 in.

2

3

FRAME BRACKET, FORWARD RH

1

11

U-BOLT, ½-13 x 7-3/4 x 4-1/2 in.

4

4

FRAME BRACKET, REAR RH

1

12

HEX NUT, 1/2-13 in.

9

5

CARRIAGE BOLT, 5/8-11 x 3-1/2 in.

2

13

CONICAL WASHER, ½ in.

9

6

CARRIAGE BOLT, 5/8-11 x 6 in.

2

14

NUT, 5/8-11 in.

4

7

TUBE SPACER, 4 in. LONG

2

15

CARRIAGE BOLT, 1/2-13 X 1-3/4 in.

1

8

CONICAL WASHER, 5/8 in.

4

16

BLOCK, 1 x 3 x 1/4 in.

1

Equipment Required:

Fastener Kit: 116629
Wrenches: 3/4, 7/8, 15/16

Drill Bits: 1/8 in., 9/16 in., 11/16 in.
Other Tools: Center Punch, Measuring Tape, 1-1/8 in. hole saw

PLEASE READ ALL INSTRUCTIONS BEFORE STARTING INSTALLATION

Drivers side

Passengers side

Inside frame

Some of the

fasteners

shown are

supplied with

the rail kit.

Advertising