Procedure for aluminum terminations, Procédure pour les raccordements en aluminium – GE Industrial Solutions Spectra Series Power Panelboards AMC3FGB, AMC2FGB, AMC3FGM or AMC2FGM Manuel d'utilisation

Page 3

Advertising
background image

Figure 6. Securing the module to the interior.

Figure 6. Fixation du module à l’intérieur.

4. Wire the circuits. Refer to the label on the circuit

breaker for the proper tightening torque.

5. Install lug covers on line and load ends of breaker.

Secure with plastic threads cutting screws provided in

kit.

6. Filler plate kits. Install filler plate kit AFP4FGSB on

the module for breakers used as a branch.

AFP4FGSM for breakers used as a main.

Procedure for Aluminum

Terminations

1. Strip the insulation, being careful to not nick the

wire.

2. Clean the wire strands with a wire brush.

3. Thoroughly coat the stripped conductor with a

suitable antioxidant compound, such as ALNOX or

PENETROX A13.

4. Insert the conductor and tighten the connector screw

to the torque indicated on the rating label.

6. Kits de plaque d’obturation. Installer le kit de plaque

d’obturation AFP4FGSB sur le module pour un

disjoncteur utilisé comme dérivation. Installer le kit

AFP4FGSM pour un disjoncteur utilisé comme

principal.

Procédure pour les raccordements en

aluminium.

1. Dénuder l’isolation, en prenant soin de ne pas

entailler le câble.

2. Nettoyer les brins du conducteur avec une brosse

métallique.

3. Bien enduire le conducteur dénudé d’une pâte anti-

oxydante convenable telle que ALNOX ou

PENETROX A 13.

4. Insérer le conducteur et serrer la vis du connecteur

au couple indiqué sur l’étiquette de calibrage.

Advertising