Figure 7, Attention – procedure for aluminum terminations – GE Industrial Solutions Spectra Power Panelboard: Record Plus FC Breaker Plug-in Modules Manuel d'utilisation

Page 3

Advertising
background image

Latch Lock

Screw

Figure 7. Installing the breaker module.

6. Wire the circuits. Refer to the label on the circuit

breaker for the proper tightening torque.

7. Filler plate kits. Install the appropriate filler plate

kits, as listed in Table 1.

Filler Plate

Cat. No.

Module Type

AFP3FDD

AMC6FDB

AMC4FDB

AFP4FDD

AMC6FDBS

AMC4FDBS

Table 1. Filler plate kit for each breaker module type.

Attention – Procedure for Aluminum

Terminations

1. Strip the insulation, being careful to not nick the

wire.

2. Clean the wire strands with a wire brush.
3. Thoroughly coat the stripped conductor with a

suitable antioxidant compound, such as ALNOX or

PENETROX A13.

4. Insert the conductor and tighten the connector screw

to the recommended torque, as indicated on the

rating label.