BUILD AND INSTALL THE ZONELINE
BASE PLATFORM

1. Construct a 23

1

4

″ min. x 23

1

4

″ min. square platform

with legs to raise the platform a minimum of 8

″.

NOTE: The platform must have a load-bearing
capacity of 175 lbs. minimum.

1

Installation Instructions

18

WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION

• Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions

provided with the plenum.

IMPORTANT:

The wall plenum is not designed to carry structural loads.

Proper wall header construction is required. The plenum requires proper flashing,
shim and caulk for a weather resistant installation.

Properly square
and level plenum.

Proper header for structural
support.
Apply proper caulking
and flashing.

Architectural Louver—

RAVAL1

Exterior/Outside Wall

Case

Wall Plenum

RAVWP6 – 6

″D x 19

3

4

″W x 32″H

RAVWP8 – 8

″D x 19

3

4

″W x 32″H

RAVWP12 – 12

″D x 19

3

4

″W x 32″H

RAVWP15 – 15

″D x 19

3

4

″W x 32″H

2. Make drain hole cutout(s):

Primary Drain – Centerline of drain is

approximately 5

1

4

″ from left platform edge

and 8

1

2

″ from back platform edge.

Secondary Drain – Centerline of drain

is approximately 6

1

2

″ from left platform edge

and 5

1

4

″ from back platform edge.

3. Place the platform in the utility closet

with the following clearance between it
and the interior surface of the walls/door/panel:
4

min. from front of the case –

Unit to be installed through FRONT of case

5

min. from front of the case –

Unit to be installed through SIDE of case

3

min. from two sides of the case

4. Align the platform with the opening of

the wall plenum and secure to the floor
using appropriate brackets and bolts.

23

1

4

″ min.

8

″ min.

for drain
access

Cutout for drain
connection(s)
(see NOTE below)

Back of platform

Left side of platform

NOTE: Specific cutout size
for drain connections needs
to be determined by the installer
for the given installation situation.