Installation instructions, Electrical requirements, Move washer – Maytag MVWC350WW Installation Manuel d'utilisation

Page 4: Locate shipping materials

Advertising
background image

4

INstaLLatION INstrUCtIONs

Before you start: remove shipping materials

It is necessary to remove all shipping materials for proper

operation and to avoid excessive noise from washer.

36"

(914 mm)

1.

Move washer

Move washer to within 3 ft (914 mm) of its final location; it must

be in a fully upright position.

NOTE:

To avoid floor damage, set washer onto cardboard

before moving it.

Locate yellow shipping materials on back of washer, near

bottom. If it is a straight power cord and cord restraint, follow

steps 3 & 4 then continue to step 6; if power cord is looped,

skip to step 5.

Straight power cord Looped power cord

2.

Locate shipping materials

eLeCtrICaL reQUIreMeNts

A 120 volt, 60 Hz., AC only, 15- or 20-amp, fused electrical

supply is required. A time-delay fuse or circuit breaker on

a separate circuit serving only this washer is recommended.

This washer is equipped with a power supply cord having

a 3 prong grounding plug.

To minimize possible shock hazard, the cord must be

plugged into a mating, 3 prong, grounding-type outlet,

grounded in accordance with local codes and ordinances.

If a mating outlet is not available, it is the personal

responsibility and obligation of the customer to have the

properly grounded outlet installed by a qualified electrician.

If codes permit and a separate ground wire is used, it is

recommended that a qualified electrician determine that

the ground path is adequate.

Check with a qualified electrician if you are not sure the

washer is properly grounded.

Advertising
Ce manuel est liée aux produits suivants: