2 - opening the instrument panel, 1 indirect water heater priority selection – Slant/Fin VSL-160C Part A Manuel d'utilisation

Page 29

Advertising
background image

29

A = Front cover of the electrical box
B = Plastic spring to open the electrical box
C = Direction to open the electrical box
D = Switches for the functional setting of the boiler

Figure 9-2 Control board and unit electrical box details

9 - INSTALLATION - Connecting to an indirect water heater

9.1.1 Indirect water
heater priority selection

The boiler is factory set for DHW
priority. This means that the boiler will
stay in DHW mode until the capacity
of the indirect water heater reaches
temperature. In some cases this will
result in the house cooling because
the central heating function was
stopped by the DHW priority mode.
Once the indirect water heater is
satisfi ed the boiler will automatically
return to central heating.

Priority selection is a functionality
that toggles between CH and DHW
demand when they are both active at
the same time. The priority selection

is set with the

(DHW Priority)

parameter in the “Installer menu” (see
Section 13.17).

Each value set into the

parameter will correspond to the
minutes delay boiler toggles between
Central Heating and DHW demand.

9.2 - Opening the
instrument panel

To open the instrument panel and gain
access to the boiler control board,
follow this procedure:
1. disconnect the boiler from the

electrical supply;

2. remove the boiler casing according

to the instructions given in Section
14.2;

3. push the plastic spring tabs “B”

shown in Figure 9-2;

4. open the front half of the electrical

box in the “C” direction as shown in
Figure 9-2;

Advertising
Ce manuel est liée aux produits suivants: