8 - installation - electrical connections, 1 - connecting the power supply cable, 2 - wiring the heating pump for 160-b model – Slant/Fin VSL-160C Part A Manuel d'utilisation

Page 26

Advertising
background image

26

CAUTION!!!

Ensure that heating

and water piping is not used as
a ground connections for the
electric and telephone systems.
This piping is completely
unsuitable for this purpose and
could rapidly lead to serious
corrosion damage to the boiler,
piping and radiators, voiding the
warranty

CAUTION!!!

The boiler is not

provided with any protection
against lightening strikes.

8.1.1 - Connecting the
power supply cable

Provide and install a fused disconnect or
service switch (15 amp recommended)
as required by the code. To connect the
electrical power supply cable, follow the
steps below while referring to Figures 8-1
and 8-2:

1. remove the boiler casing following the

instructions given in Section 14.2 and
open the junction box cover;

2. press the two plastic springs tabs

labeled “B” on the bottom side;

3. open panel “A” in the “C” direction;
4. remove the three screws labeled “D”;
5. open door “E” in the “F” direction;
6. install the power supply wires, “G” as

shown;

7. strip the power supply wires being

careful to leave the ground wire 1in
(25 mm) longer than the other two;

8. connect the ground wire to the ground

terminal;

9. connect the 120 volt hot wire to

terminal “L1”;

10. connect the 120 volt neutral wire to

terminal “N”.

NOTICE! If the 120 volt power wires
are inverted, the boiler will block,
displaying error code E21.

NOTICE! If the boiler is not properly
grounded, the boiler will block,
displaying error code E23

8.1.2 - Wiring the heating
pump for 160-B model

On 160-B model the heating pump is
not supplied with the boiler. Install the
heating pump following Section 7.2.4. If
the boiler is not connected to an indirect
water heater, wire the heating pump to
the boiler following the steps below while
refering to Figures 8-1 and 8-2:
1. remove the boiler casing according to

the instructions given in section 14.2
and open the junction box cover;

2. use a three wire cable with a minimum

cross section of # 14 AWG between
the boiler and the circulator pump;

3. route the circulator cable through an

empty cable clamp in the junction box;

4. connect the Hot and Neutral cable

wires respectively to the “4 and 5”
terminals in the junction box;

5. connect the Ground wire to an empty

“Ground” connection inside the
junction box.

8 - INSTALLATION - Electrical connections

Figure 8-2 Electrical connections for 160-C model (Refere to Figure 7-6)

GROUND

NEUTRAL

120Vac LINE (HOT)

System pump (see
piping diagram of
Figure7-6)

120Vac hot central heating

Room thermostat

Outdoor sensor (optional)

Neutral

Advertising
Ce manuel est liée aux produits suivants: