Installation arc master 175 se, 06 manual arc (stick) setup – Tweco 175 SE Arc Master Manuel d'utilisation

Page 25

Advertising
background image

INSTALLATION

ARC MASTER 175 SE

Manual 0-5054 3-5 INSTALLATION

3.06 Manual Arc (STICK) Setup

Figure 3-2: Setup for Manual Arc (STICK) Welding

Manual Arc Sequence of Operation

1. Switch the ON/OFF Switch (located on the rear panel)

to OFF.

2. Connect the earth clamp lead to the Negative Output

Terminal and electrode holder lead to the Positive

Output Terminal. Consult the electrode manufacture's

packaging for the correct electrode polarity.

3. Plug the Power Source in and switch the power switch

ON.

4. Set the Process Switch to Manual Arc.
5. Set the Weld Current control to the desired welding

current.

6. Switch the ON/OFF Switch (located on the rear panel)

to the ON position. This will immediately energize the

power supply up to the output terminals and the elec-

trode holder.

7. Commence welding. If necessary, readjust the Weld

Current control to obtain the welding condition re-

quired.

8. After completion of welding the Power Source should

be left turned ON for 2 to 3 minutes. This allows the

fan to run and cool the internal components.

9. Switch the ON/OFF Switch (located on the rear panel)

to the OFF position.

Set Welding Current
as Specified by the
Electrode Manufacturer

Set Process Selection
Switch to Manual Arc

Positive Output Terminal
(Dinse™ 50)

Negative Output Terminal
(Dinse™ 50)

Art #: A-08469_AC

Advertising
Ce manuel est liée aux produits suivants: