Arc master 175 se installation – Tweco 175 SE Arc Master Manuel d'utilisation

Page 24

Advertising
background image

ARC MASTER 175 SE INSTALLATION

INSTALLATION 3-4 Manual 0-5054

3.05 Setup for Welding

NOTE

Conventional operating procedures apply when us-

ing the Welding Power Source, i.e. connect work

lead directly to work piece and electrode lead is used

to hold electrode. Wide safety margins provided by

the design ensure that the Welding Power Source

will withstand short-term overload without adverse

effects. The welding current range values should be

used as a guide only. Current delivered to the arc is

dependent on the welding arc voltage, and as weld-

ing arc voltage varies between different classes of

electrodes, welding current at any one setting would

vary according to the type of electrode in use. The

operator should use the welding current range values

as a guide then fine tune the welding current to suit

the application.

!

WARNING

Before connecting the work clamp to the work and

inserting the electrode in the electrode holder make

sure the Primary power supply is switched off.

CAUTION

Remove any packaging material prior to use. Do not

block the air vents at the front or rear of the Welding

Power Source.

Advertising
Ce manuel est liée aux produits suivants: