3-pole branch breaker, A, B, &
C

Ø

location

.

See steps 4a & b.

3-pole disjoncteur de
dérivation, location A, B, &
CØ. Voir Étapes 4a & b.

2-pole branch breaker, A & C

Ø

location

.

See steps 5c & d.

2-pole disjoncteur de
dérivation, location A & CØ.
Voir Étapes 5c & d.

2-pole branch breaker, A &
B

Ø

location

.

See steps 5a & b.

2-pole disjoncteur de
dérivation, location A & BØ.
Voir Étapes 5a & b.

2-pole branch breaker, B &
C

Ø

location

.

See steps 5e & f.

2-pole disjoncteur de
dérivation, location B & CØ.
Voir Étapes 5e & f.

Figure 5. Possible bus strap combinations.

Figure 5. Combinaisons possibles de brides de barre omnibus.

5. Two-pole installations. Use the following procedure for

all two-pole installations (kit AMCB4FGB).

• For installations using phases A and B, continue with

step 5a.

• For installations using phases A and C, go to step 5c.

• For installations using phases B and C, go to step 5e.

5. Installations deux pôles. Utiliser la procédure suivante

pour toutes les installations deux pôles (kit
AMCB4FGB).

• Pour les installations utilisant les phases A et B,

continuer avec l’étape 5a.

• Pour les installations utilisant les phases A et C, aller à

l’étape 5c.

• Pour les installations utilisant les phases B et C, aller à

l’étape 5e.