Warning, Installing pad strips, Complete installation – Maytag W10277179A Manuel d'utilisation

Page 9

Advertising
background image

9

Installing Pad Strips

NOTE: For PD Models only.

1. Take the 2 foam pad strips from bag.

2. Remove the tape from the back of the adhesive pads.

3. Install the pads on the left and right inside walls of the coin

vault, leaving about 1/4 to 1/2 inch of space near the front
edge of the vault to allow room for the coin box to lock into
position.

Complete Installation

1. Check the electrical requirements. Be sure that you have the

correct electrical supply and the recommended grounding
method. See “Electrical Requirements.”

2. Check that all parts are now installed. If there is an extra part,

go back through the steps to see which step was skipped.

3. Check that you have all of your tools.

4. Dispose of/recycle all packaging materials.

5. Check that the water faucets are on.

6. Check for leaks around faucets and inlet hoses.

7. Plug into a grounded 3 prong outlet.

8. To test and to clean your washer, measure 1/2 the detergent

manufacturer’s recommended amount of High Efficiency (HE)
detergent for a medium-size load. Pour the detergent into the
detergent dispenser. Select any cycle and allow the washer to
complete one whole cycle.

A.Foam pad strips

A

Electrical Shock Hazard

Plug into a grounded 3 prong outlet.

Do not remove ground prong.

Do not use an adapter.

Do not use an extension cord.

Failure to follow these instructions can result in death,
fire, or electrical shock.

WARNING

Advertising