Step 3, check door balance, Step 4, remove wood base, install leveling legs, Step 5, remove toekick – GE Monogram Built-In Dishwashers Manuel d'utilisation

Page 8: Step 6, remove toekick brace, Installation instructions, Important, Remove wood base, install leveling legs, Step 4 remove toekick, Step 5, Check door balance

Advertising
background image

REMOVE WOOD BASE, INSTALL
LEVELING LEGS

IMPORTANT

Do not kick off wood base!

Damage will occur.

• Move the dishwasher close to the installation location and lay

it on its back.

• Remove the four leveling legs on the underside of the wood base

with an adjustable wrench or 15/16" socket.

• Discard base.

• Screw leveling legs back into the dishwasher frame approximately

1/8" from frame as shown.

STEP 4

REMOVE TOEKICK

Remove the 2 toekick
screws and toekick.
Set aside for use
in Step 23.

STEP 5

Installation Instructions

Figure K

Figure L

CHECK DOOR BALANCE

• With dishwasher on the wood skid, check the door

balance by opening and closing the door.

• If the door drops when released, increase the spring tension.

If the door rises when released, decrease the tension.

• There are two types of counter balance and therefore two

methods of adjustment. Identify which counter balance is
present and adjust tension accordingly. Please note: if
there are 3 holes on the cable, use the cable to adjust;
if there is one hole on cable use the tub leg to adjust.

Type 1 – One-hole cable
Adjust tension by moving spring hook to one of the three
holes on the tub leg.

Type 2 – Three-hole cable
Adjust tension by moving spring hook to one of the three
holes on the pulley cable.

After adjusting spring tension, open and close the door to
make sure the door operates smoothly. If the door is hard
to move or if the spring cable binds, check the routing of
the spring cable. The cable should be routed between the
shoulders of the pulley cable roller. If the cable is off the
roller: latch door, remove spring tension and route the
cable between the shoulders of the roller. See Figure J.

STEP 3

Figure H

Figure I

Figure J

Correct Spring

Cable Routing

Pulley

Shoulder

Incorrect Spring

Cable Routing

REMOVE TOEKICK BRACE

Skip this step if your model does not have a sound upgrade kit.
If your model does have a sound upgrade kit, this brace must
be removed.

Remove the 2 toekick
brace screws and
toekick brace.
Discard brace
and set screws
aside for use in
Step 22.

STEP 6

Figure M

INCREASE

DECREASE

One Hole

Approx.
1/8"

Remove 2
Toekick Screws

Toekick

Use This
Mounting
Hole

Decrease
Tension

Increase
Tension

8

Remove 2

Toekick Screws

Advertising