Hitching up the machine

The seed drill hitches to the lower arms of the
category 3/2 hydraulic lifting mechanism.

- After hitching up, slightly tighten the lifting arm

side stabilizers to limit the movement of the draw
bar during manoeuvres and transport operations.

O

N

THE

ROAD

:

- Follow the rules of the road

- Comply with the machine’s GVWR (gross vehicle

weight rating) and maximum authorised speed.

- Ensure that the linkage height from the ground

B

B

is 1130 mm for transport.

- Connect the pneumatic / hydraulic braking

connection

- Connect the breakaway safety cable to a point on

the tractor that is sufficiently strong to ensure
that the emergency brakes

will operate if

required.

W

HEN

WORKING

:

- The height of the linkage is important; ensure

that you comply with distance

A

A

(ball joint /

ground of 600mm).

1

1

3

3

2

2

1

1

Attelage

Le semoir s'attelle au bras inférieur du relevage
hydraulique cat 3-2.

- Après attelage, tendre légèrement les

stabilisateurs latéraux de bras de relevage pour
limiter les mouvements de la flèche lors des
manœuvres et opérations de transport.

S

UR

LA

ROUTE

:

- Respecter le code de la route

- Respecter le PTAC et la vitesse maximum

autorisée de la machine.

- Respecter la hauteur

B

B

d’attelage, 1130 mm

du sol pour le transport.

.

- Brancher la prise pneumatique / hydraulique de

freinage

- Accrocher le câble de sécurité “rupture

d’attelage” sur un point du tracteur suffisamment
solide pour assurer le freinage des freins de
secours

.

A

U

TRAVAIL

:

- La hauteur d’attelage est importante, respecter la

distance

A

A

(rotule / sol de 600mm )

1

1

2

2

3

3

1

1

Mise en route /

Start-up

GB

FR

13

Advertising