Enerpac 11-400 Manuel d'utilisation

Page 4

Advertising
background image

4

Use whenever sudden pressure drops are
anticipated (such as when testing vessels to
destruction).
Install gauge as shown in illustration 3. The shut-off
valve (Modelnr. 72-750) protects the gauge against
recoil damage when the test vessel ruptures. For
maximum protection, the shut-off valve should be
nearly closed during operation of the pump.

6.0 OPERATION
6.1 To Pressurize the System
Turn pump release valve to maximum clockwise
"closed" position (finger-tight). Operate the pump
handle until the desired system pressure is attained
or operation is completed.

NOTE: "Spongy" pump action indicates that there is
air in the pump or external hydraulic system.

6.2 To Relieve Pressure from the System
Turn pump release valve counterclockwise to "open"
position (approximately one turn).

WARNING: Check pressure gauge to be
sure system hydraulic pressure has
dropped to zero before attempting to

disconnect pump.

6.3 To Purge Air From the Pump
1. Open pump release valve (approx. one turn).
2. Loosen outlet port gland nut.
3. Close pump release valve.
4. Operate pump handle until air is expelled.
5. Torque outlet port gland nut to 67 Nm [50 Ft.lbs].
6. Check pump operation. Repeat above procedure

if necessary.

7. If pump action continues to feel "spongy", bleed

the external hydraulic system.

7.0 PRESSURE TESTING OF LARGE VESSELS
1. Install a tee (Modelnr. 43-300) and shut-off valve

(Modelnr. 72-750) as shown in Figure 4.

CAUTION: Install the shut-off valve so that
the flow arrow points away from the tee and
toward the fluid supply line so that the valve

inlet port will be subjected to the high test pressures.
See Figure 4.

2. Remove pump reservoir filler plug and fill pump

reservoir with test fluid.

3. To fill test vessel:

a.

Turn the pump release valve to maximum
clockwise "closed" position (finger-tight).

b.

Open fluid supply shut-off valve.

c.

When test vessel is filled, close fluid supply
shut-off valve.

4. Operate pump until desired system pressure is

developed.

CAUTION: The fluid supply shut-off valve
must remain closed at all times during the
pressure test.

5. After test is completed, open pump release valve.

WARNING: Check pressure gauge to be
sure system hydraulic pressure has
dropped to zero before attempting to drain
test vessel or disconnect pump.

illustration 4 – Large vessel pressure test

Gauge

Tee

Pump

Shut-Off
Valve

Fluid supply
line

Model
Number

11-100

11-400

Pressure

Rating

Type of

pump

10000 psi

700 bar

40000 psi

2800 bar

Single-

speed

Single-

speed

Usable Oil

Capacity

45 in

3

737 cm

3

45 in

3

737 cm

3

Oil Displacement

per Stroke

.152 in

3

2,49 cm

3

.038 in

3

0,62 cm

3

Piston

Diametre

.50 inch

12,7 mm

.25 inch

6,4 mm

Piston

Stroke

.780 inch

19,8 mm

.780 inch

19,8 mm

TABLE 1 – SPECIFICATIONS