Connecting the cylinder – CAMPO EQUIPMENT BLAZE 800 D/G Manuel d'utilisation

Page 6

Advertising
background image

CAMPO EQUIPMENT CO. LTD. (ECOBLAZE)

6 Carson Court, Brampton, ON, CANADA, L6T 4P8

Tel: (905) 793-2525 | Fax: (905) 793-8768 | www.campoequipment.com

CONNECTING THE CYLINDER

IF CYLINDERS ARE USED TO SUPPLY THE HEATER, NO CYLINDERS SMALLER THAN 100
LB CAPACITY SHALL BE USED. THESE CYLINDERS MUST SUPPLY A VAPOUR
WITHDRAWAL ONLY.

1.) ALL CYLINDER CONNECTIONS MUST BE MADE USING A WRENCH TO TIGHTEN THE

POL FITTING.

2.) BE SURE THAT THE CYLINDER VALVE IS IN THE CLOSED POSITION WHEN

CONNECTING OR DISCONNECTING THE CYLINDER.

3.) PROPER PROCEDURE FOR GAS LEAK TESTING: A SOAP AND WATER SOLUTION

MUST BE APPLIED TO ALL CONNECTIONS IN ORDER TO LEAK CHECK THE SYSTEM.

4.) THE HOSE ASSEMBLY MUST BE VISUALLY INSPECTED PRIOR TO EACH USE OF

THE HEATER.


THE GAS MUST BE TURNED OFF AT THE PROPANE SUPPLY CYLINDER(S) WHEN THE
HEATER IS NOT IN USE. WHEN THE HEATER IS TO BE STORED INDOORS, THE
CONNECTION BETWEEN THE PROPANE SUPPLY CYLINDER(S) AND THE HEAtER MUST BE
DISCONNECTED AND THE CYLINDERS REMOVED FROM THE HEATER AND STORED IN
ACCORDANCE WITH STANDARDS FOR THE STORAGE AND HANDLING OF LIQUIFIED
PETROLEUM GASES, ANSI/NFPA 58 AND CSA B149.1, NATURAL GAS AND PROPANE
INSTALLATION CODE.

Pump Pressure

N/A 160

PSI

GPH

N/A 6.2

GPH

Fuel

NG or LP

No. 1 or No. 2 /

Kerosene or

Furnace Oil

Head Setting

10.5

4

Air Setting (Beckett-
Shutter/Band) (Riello Air
Gate)

7/1

6/0

APPROVAL AGENCY


OMNI

OMNI

DRY WEIGHT (lbs)

1600 1600

Dimensions

111" X 33.25" X  

50" 

111" X 33.25" X 

50" 

 

FLUE SIZE

8”

8”

Advertising