SEQUENCE OF OPERATION FOR BLAZE 800 D/G

With “Main Switch” in “ON” position and “Controls” in “ON” position and selector on “HEAT”
operation and selector switch in “STAT ON” position and heat stat plugged into receptacle:
1: Heat stat senses a drop in temperature and the ignition control module is energized.
2: The module performs a safe start check and the burner and spark generator start. Burner lights, ignition
stops, and flame current is sensed.

For oil: the Genisys primary control contacts close, the burner motor and ignitor are
energized after a 45 second delay. The primary control energizes the pump solenoid valve and flame is
established. The cad cell senses flame and the burner continues to fire.

3: Temperature controller thermocouple heats up to factory set point (95F) and circulating air blower starts.
4: When the heat stat senses space temperature at set point, the burner shuts down.
5: The circulating blower continues to operate until the air in the unit cools to the factory set point (80F)
then turns off.

With selector switch in “BYPASS” position:
1: The module performs a safe start check and the burner and spark generator start.
2: Burner lights, ignition stops, and flame current is sensed.
3: Temperature controller thermocouple heats up to factory set point (95F) and circulating air blower starts.
4: When the heat/fan selector switch is placed to the off position the burner shuts down.
5: The circulating blower continues to operate until the air in the unit cools to the factory set point (80F)
then turns off.


OPERATING INSTRUCTIONS FOR BLAZE 800 D/G