Combustion air adjustments – CAMPO EQUIPMENT BLAZE 1000 D/G Manuel d'utilisation

Page 17

Advertising
background image

WARNING: TURN OFF THE FUEL SUPPLIES AND POWER BEFORE PERFORMING SERVICE
WORK. THE 208V/240V CIRCUIT IS A POTENTIAL ELECTROCUTION HAZARD.

THE HEAT EXCHANGER CAN NOW BE CLEANED ENTIRELY FROM THE CLEAN-OUT PORTS AND THE FLUE
PIPE CONNECTION.


HEAT EXCHANGER CLEANING PROCEDURE

1.) REMOVE HEATER BOX PANELS
2.) REMOVE EASY ACCESS PANELS LOCATED ON HEAT EXCHANGER
3.) REMOVE BAFFLES FROM SECONDARIES AND CLEAN
4.) SHOVE FLEXIBLE BRUSH VIA ACCESS PANELS AND CLEAN THOROUGHLY
5.) SHOVE FLEXIBLE VACUUM VIA ACCESS PANELS AND VACUUM THOROUGHLY


HEAT EXCHANGER REASSEMBLY AFTER CLEANUP

1.) CLOSE EASY ACCESS PANELS ON HEAT EXCHANGER
2.) CLOSE HEATER BOX PANELS

COMBUSTION AIR ADJUSTMENTS

BLAZE 1000 D/G
SPECIFICATIONS

BLAZE 1000G-
BECKETT (NG/LP)


BLAZE 1000D-
BECKETT (OIL)

NG Set up (All heaters
come factory set for
propane use)

Easy switch over

Blue handle Ball

Valve on Gas

manifold.

Closed position:

Propane

Open position:

Natural Gas

N/A

Manifold pressure “W.C.

3.8 NG/5 LP
(Pressure to be set
before NG/LP
switchover valve
and after adjusting
valve on manifold)
NOTE: If pressure
reading taken after
NG/LP switchover
valve then pressure
is to be 2.2”

N/A

Minimum/Maximum
Supply Pressure

“W.C.

8/12

N/A

CAMPO EQUIPMENT CO. LTD. (ECOBLAZE)

6 Carson Court, Brampton, ON, CANADA, L6T 4P8

Tel: (905) 793-2525 | Fax: (905) 793-8768 | www.campoequipment.com

Advertising