Sequence of operation for blaze 600 d, Operating instructions for blaze 600 d – CAMPO EQUIPMENT BLAZE 600 D Manuel d'utilisation

Page 8

Advertising
background image

CAMPO EQUIPMENT CO. LTD. (ECOBLAZE)

6 Carson Court, Brampton, ON, CANADA, L6T 4P8

Tel: (905) 793-2525 | Fax: (905) 793-8768 | www.campoequipment.com

SEQUENCE OF OPERATION FOR BLAZE 600 D

With “Selector Switch” in “Thermostat” position and heat stat plugged into receptacle:
1: Heat stat senses a drop in temperature and the ignition control module is energized.
2: The module performs a safe start check and the burner and spark generator start. Burner lights, ignition
stops, and flame current is sensed.

For oil: the Genisys primary control contacts close, the burner motor and ignitor are
energized after a 45 second delay. The primary control energizes the pump solenoid valve and flame is
established. The cad cell senses flame and the burner continues to fire.

3: Temperature controller thermocouple heats up to factory set point (120F) and circulating air blower
starts.
4: When the heat stat senses space temperature at set point, the burner shuts down.
5: The circulating blower continues to operate until the air in the unit cools to the factory set point (80F)
then turns off.

With selector switch in “BYPASS” position:
1: The module performs a safe start check and the burner and spark generator start.
2: Burner lights, ignition stops, and flame current is sensed.
3: Temperature controller thermocouple heats up to factory set point (120F) and circulating air blower
starts.
4: When the selector switch is placed to the off position the burner shuts down.
5: The circulating blower continues to operate until the air in the unit cools to the factory set point (80F)
then turns off.

OPERATING INSTRUCTIONS FOR BLAZE 600 D

STARTING HEATER

1.)

ENSURE HEATER IS ON FLAT, LEVEL GROUND BEFORE STARTING, CANOPY AND FAN GUARDS
MUST BE CLOSED.

2.)

MAKE SURE “Selector Switch” IS IN “OFF” POSITION.

3.)

PLUG INTO 120 Volts 20 Amp POWER SUPPLY

4.)

TURN “SELECTOR SWITCH” TO “ON” POSITION.

5.)

FOR THERMOSTAT OPERATION FLIP SELECTOR SWITCH TO “STAT ON” POSITION.

Please Note: When using a generator for electrical supply, make sure the generator is properly grounded and
is running at a 60HZ frequency. In the event that a generator is being used and the generator runs out of fuel,
make sure the heater “Selector Switch” is in the “OFF” position before restarting generator, failure to do so
may damage heater.


STOPPING HEATER

1.) Flip selector switch to “OFF” position. The supply fan will continue to operate until the heat exchanger has

sufficiently cooled. Do not disconnect main power until supply fan has stopped running and “Selector Switch” is
on “OFF” position.


WARNING BEFORE REMOVING ANY GUARDS OR SAFETIES TURN “MAIN SWITCH” TO “OFF” POSITION AND
DISCONNECT THE MAIN POWER AS THE SUPPLY FAN WILL CYCLE AUTOMATICALLY.


IF HEATER FAILS TO START

Advertising