6. connecting gas/air supply, 7. installing and connecting work clamp, 8. electrical service guide – Hobart Welding Products AIRFORCE OM-279 Manuel d'utilisation

Page 15

Advertising
background image

OM-279 Page 11

2-6.

Connecting Gas/Air Supply

1

Unit Gas Fitting (Female 1/4
NPT)

2

Quick Connect Gas Fitting

3

Standard Gas Fitting

Obtain and install desired fitting.

4

Hose

Obtain suitable hose according to
installed fitting, and connect to fit-
ting. Route hose to gas/air supply.

Adjust gas/air pressure according
to Section 3-2.

Y

Incorrect plasma gas can
cause torch and power
source damage. Use only air
or nitrogen for the plasma
gas.

Ref. ST-801 455

From Gas/Air Supply

3

Use only clean and dry gas/air with 70 to 150 psi
(483 to 1034 kPa) pressure.

2

1

4

2-7.

Installing And Connecting Work Clamp

ST-800 958

1

Work Cable From Unit

2

Ring Terminal

3

Screw

4

Work Clamp Handle

Connect ring terminal end of cable
to handle using screw.

Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.

Tools Needed:

1

2

3

4

2-8.

Electrical Service Guide

Single-Phase Models

Three-Phase Models

Input Voltage

200

230

460

230

460

575

Input Amperes At Rated Output

42.3

36.8

18.4

18.4

9.2

7.4

Max Recommended Standard Fuse Or Circuit Breaker Rating In
Amperes

60

60

30

30

15

10

Min Input Conductor Size In AWG/Kcmil

8

10

14

14

14

14

Max Recommended Input Conductor Length
In Feet (Meters)

110 (33)

97 (29)

153 (47)

66 (20)

266 (81)

415

(127)

Min Grounding Conductor Size In AWG/Kcmil

10

10

14

14

14

14

Reference: 1993 National Electrical Code (NEC)

S-0092-J

Advertising