Installation instructions, Plug in refrigerator, Move to final location – Dacor IF36RNBOL Manuel d'utilisation

Page 17: Warning

Advertising
background image

15

Installation Instructions

Using a cordless drill, drill a ¼” (6.35 mm) hole in the cold

5.

water pipe you have selected.

Fasten the shutoff valve to the cold water pipe with the pipe

6.

clamp. Be sure the outlet end is solidly in the ¼” (6.35 mm)

drilled hole in the water pipe and that the washer is under the

pipe clamp. Tighten the packing nut. Tighten the pipe clamp

screws slowly and evenly so washer makes a watertight seal.

Do not overtighten, or you may crush the copper tubing.
Slip the compression sleeve and compression nut on the

7.

copper tubing as shown. Insert the end of the tubing into the

outlet end squarely as far as it will go. Screw compression nut

onto outlet end with adjustable wrench. Do not overtighten the

clamp or the sleeve to prevent crushing of the copper tubing.
IMPORTANT: Before attaching the tubing to shutoff valve,

flush the main water supply line to remove particles and air in

the water line. Allow enough flow so that water becomes clear.

Flushing the water line may help avoid filters and/or water

valves from becoming clogged.
Turn off the shutoff valve on the water pipe. Coil the copper

8.

tubing.
Check for leaks around the saddle valve.

9.

Connecting to Refrigerator

Unplug the refrigerator or disconnect power.

1.

Remove the shipping tape from the gray, coiled water tubing

2.

on the rear of the refrigerator.
Measure the distance from the shutoff valve to the opening in

3.

which the refrigerator will be located. Tubing must be extended

from the shutoff valve into the refrigerator opening following

specific guidelines. See Water Supply Requirements.
A ¼” x ¼” (6.35 mm to 6.35 mm) coupling is needed in order

4.

to connect the water tubing to an existing household water

line. Thread the provided nut onto the coupling on the end of

the copper tubing.

Turn shutoff valve on.

5.

Check for leaks. Tighten any nuts or connections (including

6.

connections at the valve) that leak.

A. Cold water pipe

B. Pipe clamp

C. Copper tubing

D. Compression nut

E. Compression sleeve

F. Shutoff valve

G. Packing nut

A
B

C

D

E

F

G

A. Water tubing

B. Nut

C. Bulb

D. Coupling (purchased)

E. Ferrule (purchased)

F. Nut (purchased)

G. Household water line (as

connected in previous section)

A

B

C

D

E F G

Plug in the refrigerator or reconnect power.

7.

Flush the water system. See

8.

Water System Preparation.

NOTE: Allow 24 hours to produce the first batch of ice. Discard

the first three batches of ice produced. Allow 3 days to completely

fill ice container.

Plug in Refrigerator

Set control switch at top of cabinet to the off position.

1.

Plug into a grounded 3 prong outlet.

2.

Move to Final Location

IMPORTANT: To avoid floor damage, make sure levelers are

raised (not touching floor) and refrigerator is on rollers before

moving.

Place top of cardboard carton or plywood under refrigerator.

1.

Remove dolly.
Do not remove protective film or cover.

2.

Move the refrigerator straight back, evenly into the opening.

3.

Be sure that the refrigerator side trims are not interfering with

the door opening. Also, be sure that the water tubing is not

kinked and the power supply cord is on top of the refrigerator.

Electrical Shock Hazard

Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death,
fire, or electrical shock.

WARNING

WARNING

Tip Over Hazard

Refrigerator is top heavy and tips easily when not

completely installed.
Keep doors taped closed until refrigerator is

completely installed.
Use two or more people to move and install

refrigerator.
Failure to do so can result in death or serious injury.

Advertising
Ce manuel est liée aux produits suivants: