H check for leaks, H installation over built-in oven, Installation instructions – GE JGP329DETBB Manuel d'utilisation

Page 7

Attention! Le texte de ce document a été détectée automatiquement. Pour consulter le document original, vous pouvez utiliser le mode "Original".

Advertising
background image

Installation Instructions

H CHECK FOR LEAKS

Before testing for leaks, make sure all burner knobs

are in the OFF position.

After connecting the cooktop to gas, check system
for leaks with a manometer. If a manometer is not
available, turn the gas supply on to the cooktop
and use a liquid leak detector at all joints and
connections to check for leaks.

Tighten all connections if necessary to prevent gas

leakage in the cooktop or supply line.

DO NOT USE OPEN FLAME TO CHECK FOR

LEAKS!

Disconnect the cooktop and its individual shut-off

valve from the gas supply piping system during any

pressure testing of that system at test pressures
greater than 1/2 psig (3.5 kPa).

Isolate the cooktop from the gas supply piping

system by closing its individual shut-off valve
during any pressure testing of the gas supply
system at test pressures equal to or less than 1/2
psig (3.5 kPa).

H INSTALLATION OVER BUILT-IN

OVEN

See built-in oven installation for complete
installation instructions.

90° Elbow

5" To Center of

2"

Dia. Hole From

Countertop

2"

DIa. Hole

(20 7/8" from front

of Countertop to

Hole Center)

Cabinet Sides

Advertising