Miller Electric Big 40 WG Manuel d'utilisation

Page 35

Advertising
background image

OM-4405 Page 31

7-2.

Connecting To Optional Auxiliary Power Plant (CC/CV Models Only)

Ref. 197 399 / 802 332-E

.

Place Process/Contactor switch
in Electrode Hot - Stick position
when using auxiliary power plant
(see Section 6-3).

Single-Phase Auxiliary Power

1

120/240 V 50 A Receptacle
RC5

RC5 is connected to the optional
auxiliary power plant and supplies 60
Hz single-phase power at weld/pow-
er speed. Maximum output from RC5
is 12 kVA/kW. Power available at
RC5 is reduced when welding.

2

Circuit Breaker CB7

Circuit breaker CB7 protects single-
phase receptacle RC5 and the load
wires from overload. If CB7 opens, all
auxiliary power plant output stops
and the receptacle does not work.

Three-Phase Auxiliary Power

Y

Stop engine.

Y

Power and weld outputs are
live at the same time. Discon-
nect or insulate unused
cables.

.

Have qualified person install ac-
cording to circuit diagram and
Auxiliary Power Guidelines (see
Section 10).

Remove auxiliary power panel
mounting screws. Tilt panel forward.

3

Lead 93

4

Lead 92

5

Lead 91

6

Lead 42 (Circuit Grounding
Lead)

7

Lead 90 (Neutral)

8

Isolated Neutral Terminal

9

Jumper Lead 42

10 Grounding Terminal

Jumper 42 is connected to lead 90 at
factory. Jumper 42 may be discon-
nected from neutral to meet applica-
ble electrical codes.

Lead 42 connects to front panel
Ground stud.

11 User-Supplied Leads

12 Circuit Breaker CB7 User

Terminals

Connect user-supplied leads to ter-
minals on CB7 and to the isolated
neutral terminal and grounding termi-
nal as necessary.

.

Circuit breaker CB7 protects
single-phase receptacle RC5
and the load wires from overload.
If CB7 opens, all auxiliary power
plant output stops and the recep-
tacle does not work.

Reinstall auxiliary power panel.

Tools Needed:

Volts

Amps

KVA/KW

Single

120/240

50

12

Three

240

48

20

60 Hz

Frequency

Engine Speed

1850 RPM

AC

Phase

1

Phase

3

Output

Lead 42 connects to GROUND stud on
front of unit.

Jumper 42 is connected to 90 at factory.

1

2

91

92

93

240V

120V

120V

240V

240V

1-Phase

3-Phase

3

4

5

6

7

8

9

10

11

12

Rear Of Panel

Three-Phase Power Connection

2

Single-Phase Power Connection

92

90

91

93

Y

Close panel opening
if no connections are
made to power plant.

Y

Close panel
opening if no
connections
are made to
power plant.

240V

Remove plug
before inserting
leads. Reinstall
bushing.

Advertising