Assembly, Attach the rail to the motor unit, Set the belt tension – Chamberlain 3585CS 3/4HP Manuel d'utilisation

Page 6: Assembly step 2, Assembly step 1

Advertising
background image

6

To avoid SERIOUS damage to opener, ONLY use bolts/
fasteners mounted in top of motor unit.

ASSEMBLY STEP 2

Set the Belt Tension

By hand, thread the spring trolley nut on the threaded
shaft until it is finger tight against the trolley (Figure 1).
Do not use any tools.

Insert a screwdriver tip into one of the nut ring slots
and brace it firmly against the trolley (Figure 2).

Place a 7/16" open end wrench on the square
end. Rotate about 1/4 turn until the spring releases and
snaps the nut ring against the trolley (Figure 3).

This extends the spring for optimum belt tension.

Trolley
Threaded
Shaft

Spring/Trolley Nut

The Chamberlain Group, Inc.
Liftmaster Synchro Drive
Spring Trolley Nut Assembly
3/5/92 - 5/16 /92 - 5/21/92 - 6/2/92
6/11/92

Nut
Ring

Trolley
Threaded
Shaft

Nut Ring
Slots

Square
End

Nut Ring

Trolley

Nut Ring

Trolley

1" (2.5 cm)

1-1/4" (3.18 cm)

BEFORE

AFTER RELEASE

Figure 1

Figure 2

Figure 3

ASSEMBLY STEP 1

Attach the Rail to the Motor Unit

To avoid installation difficulties, do not run the
garage door opener until instructed to do so.

Remove the bolt and lock nut from the top of the motor
unit.

Place rail onto the bolt mounted on the motor unit and
align the back hole with the hole in the top of the unit.

Fasten rail with the washered bolt and lock nut
previously removed. Tighten securely. Remember to
use only these bolts/fasteners! Any other bolts/
fasteners will cause serious damage to the opener.

Cut tape from rail, belt and styrofoam.

REMOVE STYROFOAM.

• Position belt over the motor unit sprocket.

Motor unit
Sprocket

Washered Bolt
5/16"-18x1/2"

Styrofoam

Rail
Hole

Lock Nut

USE ONLY THIS

TYPE AND SIZE

BOLT

Advertising