Attach the rail to the header bracket, Installation step 3 – Chamberlain 3585CS 3/4HP Manuel d'utilisation

Page 10

Advertising
background image

Header
Bracket

Belt Pulley
Bracket

Temporary
Support

Header Wall

Garage
Door

Clevis Pin
5/16"x2-3/4"

Ring
Fastener

Header
Bracket

Belt Pulley
Bracket

Rail

10

Clevis Pin
5/16"x2-3/4"

Ring Fastener

INSTALLATION STEP 3

Attach the Rail to the Header Bracket

Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you’ll
need help. Have someone hold the opener securely on
a temporary support to allow the rail to clear the
spring.

Position the rail bracket against the header bracket.

Align the bracket holes and join with a clevis pin
as shown.

Insert a ring fastener to secure.

HARDWARE SHOWN ACTUAL SIZE

Advertising