CCI Thermal Technologies CX1 - ProVector Explosion-Proof Convection Heater Manuel d'utilisation

Page 4

Advertising
background image

3. Secure mounting brackets to vertical surface

with the top mounting hole 1.5” (38 mm) below

the desired top surface height (Figure 1a). Refer

to Figure 2 for physical dimensions and Figure

3 for required installation clearances. Mounting

brackets are to be spaced to match the slots in

the rear panel of heater cabinet.

4. After mounting brackets are secured, tilt the

heater and lower it onto the top tabs of the

mounting bracket such that the tabs go into the

mounting slots on the rear panel of the heater

cabinet (Figure 1b).

5. Carefully swing the bottom of the heater into the

mounting brackets so that it is resting on the

bottom tab (Figure 1b).

6. Insert the securing screw through the bottom

mounting bracket tab and into the cabinet to keep

the heater from dislodging from the mounting

bracket (Figure 1b).

7. Caution: Use fasteners with yield stress greater

than or equal to 58ksi (400MPa).

Note:

Figures 1-3 are shown with optional built-in room thermostat.

FIGURE 1a

FIGURE 1b

– 4 –

FIGURE 2: Physical Dimensions

0.75 - 2.69, 3.6 (T2A)

3.01 - 3.59, 3.6 (T3),

4.8

4.76, 5.28 - 7.6

0.75 - 2.69, 3.6 (T2A)

3.01 - 3.59, 3.6 (T3),

4.8

(3/4” NPT)

4.76, 5.28 - 7.6

(3/4” NPT)

Note: Heaters with built-in thermostat come with tube extensions.

Advertising