Réglages, Settings – Sulky Maxidrill TRW 4/6 m central metering unit Manuel d'utilisation

Page 53

Advertising
background image

Calibration settings (continued)

b) Carrying out the calibration test

- Remove the locking pin from the lever

- Lower the shutter lever

(located on the right-

hand side of the metering mechanism) to open
the calibration test flap.

- Place the calibration test sack

under the

metering mechanism to collect the seed during
the test. Ensure that the sack is positioned
correctly so that no seed is lost during the test.

- Start the metering mechanism by following the

procedural instructions for the electronic unit
and using the start button

.

- Empty the sack.

- Carry out the calibration test in accordance

with the procedure for the electronic unit.

- Remove the sack and weigh its contents.

- Input the necessary information into the unit in

accordance with the instructions.

3

3

1

1

2

2

1

1

51

FR

GB

Réglages /

Settings

A

A

Réglage du débit (suite)

b) Réalisation de l’essai de débit

- Retirer la goupille de sécurité du levier

- Baisser le levier de trappe

(situé à droite du

doseur) pour ouvrir le volet d'essai de débit.

- Placer le sac d'essai de débit

sous le doseur

pour recueillir la semence lors du test. S'assurer
de la position du sac pour ne pas perdre de
graine lors de l'essai.

- Réaliser l’amorçage du doseur en suivant la

procédure du boîtier électronique et en
utilisant le bouton d’amorçage

.

- Vider le sac

- Réaliser l’essai de débit en suivant la

procédure du boîtier électronique.

- Retirer le sac et peser son contenu.

- Rentrer les informations nécessaires au boîtier en

respectant la notice de celui-ci.

3

3

1

1

2

2

1

1

1

3

Advertising