Installation – preparing the cabinet – Zephyr ZGE-E30AS Manuel d'utilisation

Page 11

Advertising
background image

9

7

3/4

7”

9-

7/8”

19-

7/8”

C/L

1-

9/16”

Installation –

Preparing the Cabinet

Fig.1

front edge

glass handle

Fig.2

1. Determine and mark center line on wall and cabinet bottom with a pencil.

2. If the cabinet bottom is recessed, wood blocking must be installed to ensure proper

alignment of the hood with the cabinet bottom. Wood blocking should be fl ush

within cabinet bottom.

3. Follow the dimensions in Fig.1 and cut-out the bottom of your cabinet to create an opening
for the hood to fi t through. If you have a frameless cabinet begin the 1-9/16” measurement
(referenced in Fig.1) from front of the cabinet door. This way the front edge of the hood will
be fl ush with the cabinet doors when closed, see Fig.2.

Advertising
Ce manuel est liée aux produits suivants: