Wiring and operation (cont.) – White Rodgers 24A06G-1 Manuel d'utilisation

Page 3

Advertising
background image

3

WIRING AND OPERATION (cont.)

All wiring should be done in accordance with local and national electrical codes and ordinances.

WIRINg

Line Voltage

Low Voltage

Line Voltage Field

Low Voltage Field

OPERATION
Heating
As the “Heat” contacts of the thermostat close, bimetal heater

#1 is energized. Approximately 45 seconds later, the warping

action of bimetal heater #1 closes line voltage switch #1 to en-

ergize the heating load. When the "Heat" contacts open, heater

#1 cools for approximately 45 seconds before switch #1 opens

to de-energize the heating load.

Cooling
As the "Cool" contacts of the thermostat close, bimetal heater

#2 is energized. Approximately 45 seconds later, the warping

action of bimetal heater #2 closes line voltage switch #2 to en-

ergize the cooling load. When the "Cool" contacts open, heater

#2 cools for approximately 45 seconds before switch #2 opens

to de-energize the cooling load.

Fig. 3. Using Heating-Cooling Thermostat to

Operate Heating and Cooling Loads

Y

O

R

W

TYPE 1F36 HEATING-COOLING THERMOSTAT

FIXED

COOLING

ANTICIPATOR

THERMOSTAT

SWITCH

BIMETAL

HEAT

ADJUSTABLE

HEATING

ANTICIPATOR

TYPE 24A06 DUAL LEVEL TEMP

WHITE

BLACK W/

WHITE STRIPE

RED

BIMETAL

HEATER #2

BIMETAL

HEATER #1

SWITCH #1

SWITCH #2

TRANSFORMER

HEATING

LOAD #1

RED

BLACK

BLUE

L1

L2

LINE

BLACK W/RED STRIPE

RED W/BLACK STRIPE

COOLING

LOAD

L1

L2

LINE

Advertising