Operation, Setup and operation checks, Wwarning – Proctor-Silex 994 Manuel d'utilisation

Page 5

Advertising
background image

5

Operation

Setup

To prepare the blender before blending,
complete the following steps:

1. Make sure the blender is unplugged and

the Speed control is set to “0”.

2. Remove the jar from the base and

inspect the jar and cutter assembly
for wear, nicks, and loose or broken
blades. Replace if necessary. See
“Replacement Parts.”

3. Raise the cover holder until it snaps into

the raised position, and then slide the
cover into the cover holder so the cover
rests in the cover holder.

4. Place the jar onto the blender base so it

rests firmly on the four jar supports.

5. Lower the cover onto the jar.

6. Insert the dosing cup into the cover opening

and turn it clockwise as far as it will go.

Blender Checks

To check the blender’s safety features,
complete the following steps:

1. Plug blender into a grounded receptacle.

2. Set the Speed control to the maximum

speed position. With the blender running,
raise the cover/cover holder and confirm

w

WARNING

Electrical Shock Hazard

Plug into a grounded 3 prong outlet.

Do not remove ground prong.

Do not use an adapter.

Do not use an extension cord.

Failure to follow these instructions
can result in death, fire, or
electrical shock.

Setup and Operation Checks

w

WARNING

Cut Hazard

Always lower cover onto jar before
operating blender.

Do not put spoon or other utensils
in jar when blending.

Failure to follow these instructions
can result in broken bones or cuts.

that when the cover is raised approximate-
ly 1

1

4

″ (30mm), the blender cutter stops

rotating within 4 seconds.

3. Remove the jar and lower the cover

holder to the first raised position. Set the
Speed control to “2” and verify that the
blender has not started.

NOTE: If the blender does not perform
correctly in either of the two previous steps,
do not operate the blender and refer to
“Requesting Assistance or Service.”

4. Unplug the blender.

Cover
holder

Cover

Dosing
cup

Jar
supports

Jar

First
raised
position

840065000-1ENv01 9/27/04 11:26 AM Page 5

Advertising