Installation instructions, Step 4, Step 5 – Fisher & Paykel Ecosmart GWL11 Manuel d'utilisation

Page 8

Advertising
background image

8

Installation Instructions

Step 4

Inlet Hoses

1.

Install hoses with the straight end (with filters)

fitted to the faucets.

2.

Install elbow ends onto washing machine (inlet

valves are marked on the back of the machine
H=hot, C=cold)
Note: If there is a cold water supply only, an inlet
valve cap (available from Fisher & Paykel) MUST
be connected to the hot valve. The cap prevents
water leaking from the hot valve.

Step 5

Leveling the Washer

1.

Insert the four rubber leveling feet inserts into the

feet on the base of the washer. (See diagram 1).

2.

Move the washer into its final position. We suggest

a minimum clearance of 1” (25mm) on each side for
ease of installation. (See diagram 2).

3.

Turn on water and check hose connections for leaks.

Check that there are no kinks in the hoses.

4.

It is IMPORTANT to level the washer to ensure

proper performance during spin.

Adjust the feet by unscrewing/screwing to make
sure the washer is level and cannot rock.

5.

Use the walls and adjacent counter tops as a sight
guide to check to see if washer appears level.
Readjust the feet if necessary.

6.

Open the lid and check the washer basket to see
that it sits slightly forward of centre. (See diagram 3).

Diagram 3

Correct

adjustment

Incorrect

adjustment

Diagram 1

Adjustable feet

Rubber insert

1” (25mm) 1” (25mm)

Diagram 2

1.

Faucet
end of
hose

2.

Washer
end of
hose

Advertising