Installation, Assembly, Placement of the dock – Roborock Empty Wash Fill Dock FCC Manuel d'utilisation

Page 10

Advertising
background image

11

Installation

Assembly

1. Place the dock on a hard and flat floor, and remove the foam

used to secure the high-speed maintenance brush components
in shipment at the bottom.

2. Attach the base by pressing down both sides of the base firmly,

and then pressing the connecting part in the middle until you
hear a click.

3. Connect the power cable to the back of the dock, and keep

excess cable inside the storage slot.

Note:

Remove the water tanks and the dustbin before moving the dock.

Note:

Power cable can exit at either side.

> 0.5 m (1.6 ft)

> 0.5 m (1.6 ft)

> 1 m (3.3 ft)

> 1.5 m (4.9 ft)

Placement of the Dock

Place the dock on a hard and flat floor (wood/tile/concrete etc.), flat
against a wall. Keep at least 0.5 m (1.6 ft) of clearance on either
side, 1.5 m (4.9 ft) in front, and 1 m (3.3 ft) above. Make sure the
location has good WiFi for a better experience with the mobile app,
and then plug it in.

Advertising