Manual 0-2654

17

INSTALLATION PROCEDURES

d. Secure the shield lead (black) to the ground

connection with the nut and star washer re-
moved above.

e. Remove the nut and star washer from the other

pilot connection inside the power supply.

f. Secure the pilot lead (red) to the pilot connec-

tion with the nut and star washer removed
above.

7. Connect the other end of the Power Lead to the

Slave Power Supply per the following procedure:

a. Feed the Power Lead through the large strain

relief at the front panel of the Slave Power Sup-
ply.

b. Remove the nut from the power connection

terminal inside the power supply.

Large

Strain Relief

Power Lead

Nut

Power Lead

Terminal Bolt

A-01496

Figure 3-18 Power Lead Connection at Slave Power

Supply

c. Secure the power lead to the connection with

the nut removed above.