General installation continued – Garland ED SERIES ELECTRIC COUNTER UNITS Manuel d'utilisation

Page 6

Advertising
background image

Part # 4521653 Rev 1 (03/05/13)

Page 6

4. Secure unit to counter top through the holes located on

the underside of the appliance using 10A sheet metal

screws.

5. Smooth the silicone seal into the crevice with finger or

tool to provide a cove seal.

COUNTER TOP

SILICONE SEALANT

Installation Of Counter Stands (Optional)

1. Assemble and level counter stand as illustrated in the

instructions found in the counter stand carton.

2. Remove and discard leveling bolts on unit to be installed

on counter stand.

3. Place units in desired position on counter stand, securing

the first unit with 8-32 machine screws and flat washers.

Insert 8-32 machine screws through the 7/32” (5mm)

diameter holes in stand into the nutserts in the bottom of

ED Series unit.

4. Connect banking plates as described in section titled,

Installation of Banking Plates.

GENERAL INSTALLATION continued

5. Secure last unit to counter stand with 8-32 machine

screws and flat washers. Inserts 8-32 machine screws

through the 7/32” (5mm) diameter holes in stand into the

nutserts in the bottom of ED series unit.

Leg Installation

The leg channel is located on the package base. This channel

must be installed when using the legs.

BOTTOM OF UNIT

LEG CHANNEL

(QTY 2)

4" [102mm]

ADJUSTABLE LEG

(QTY 4)

LEG INSTALLATION

Advertising