Dynalab 3999-0000 Manuel d'utilisation

Page 3

Advertising
background image

[ 3 ]

2. Remove the end cover from the electrical compartment

by undoing the retaining screws in the left hand panel.

3. Take the metal stand and place in the desir ed location.

Note that 2 screw holes are provided for wall
mounting. If wall mounted the unit should be secur ed
using 38mm (1.5”), No. 10 screws.

.
4. Take the boiler, the heater and the gasket kit and

assemble as shown in Figure 2.

i)

Place the bolts through the metal flange in the
manner shown and then place the metal flange
over the tapered glass tube of the boiler.

ii) Take the plastic insert and bend it r ound the glass

tube and into the metal flange. Pull the flange
and insert towards the open end of the glass tube
until the insert presses on the glass.

iii) Place the aluminium plate, followed by the silicone

ring over the heating element and locate
approximately 40-45mm from the end with the
electric cable.

iv) Insert the heating element through the tapered

glass tube and into the boiler – ensur e that there
is clearance at the inside end and no danger of
the end of the element pressing against the end
of the boiler.

v) Now secure the element using the 3 bolts

provided. Do not overtighten.

LOCATION

The Distinction Water Still can be wall or bench mounted.
Select a convenient location which has access to the
following services:-

Electricity Supply
Before connection please ensure that the line supply is
suitable. The Distinction Water Still is available in two
models, model no. D4000 for supplies rated at 3kW , 220-
240V 50/60 Hz single phase and model no. D4000/EURO
for supplies rated at 3kW, 200-230V, 50/60Hz, single phase.

Water Supply
A cold water supply capable of pr oviding a minimum flow
rate of 60 l/hr.

Drain
A waste water drain located below the level of the Still so
that the drain pipe can fall away straight without kinks or
bends, to allow an unimpeded flow.

Reservoir
A distillate collection reservoir should be located beneath
the Still.

Figure 2 Heater and thermostat tube assembly

Heater

Aluminium

plate

Silicone

ring

Plastic

insert

Metal

flange

Bolts

Boiler

Screwcap

Tapered glass tube

Boiler

thermostat

tube

40-45mm

ASSEMBLY

1.

Unpack the Still and identify the following
components:-

Qty. Component

Catalogue No.

1 Support

Stand

D4000/S

1 Boiler

D4000/B

1 Condenser

D4000/M2

1

Heating element

D240H for D4000
D220H for D4000/EURO

1 Hose

kit

W4000/HK

1 Gasket

kit

D4000/GK

1

Boiler thermostat tube

WTT48

1

Condenser thermostat tube A515414

2

Plastic connecting caps

QC18/11

2

Silicone rubber rings

QR18/7 and QR18/10

1 P

.T.F.E washer

QW18/7

1

Reservoir level control

WLS

Advertising