ASSEMBLY
1.

Unpack the water still and identify the following
components:–

Qty. Component

Catalogue No.

1

Support stand
with 2 boiler straps

W4000/S

1

Boiler

W4000/B

1

Condenser

WC48/M2

1

Heater

A6/6 (240V)

or

A6/6/EURO (220V)

1

Hose Kit

W4000/HK

1

Gasket Kit

W4000/GK

2.

Take the metal stand and place in the desired location.
Note that 2 screw holes are provided for wall fitting.

3.

Take the boiler W4000/B, the heater and gasket kit
W4000/GK. Assemble the heater into the boiler as
shown in Figure 2.

i)

Place the metal flange over the tapered glass tube
of the boiler – ensuring that the flat side of the
flange faces the boiler.

ii) Take the plastic insert and place this round the glass

tube and into the metal flange. Pull the flange
and insert towards the end of the glass tube so
that they press onto the glass.

iii) Place the rubber gasket over the heater coils and

then insert the heating element through the
tapered glass tube and into the boiler.

iv) Now secure the heater using the 3 bolts provided.

Do not overtighten.

4.

Place the boiler and heater assembly in the ‘cradle’ of
the stand. Ensure the stopcock on the boiler is facing
to the front. Feed the electric cable of the heater
through the hole in the base of the support stand.
Secure with the 2 straps provided.

5.

Fit the condenser WC48/M2 by mounting it onto the
vapour tube of the boiler. Ensure the distillate outlet
tube of the condenser faces the front.

LOCATION

The Merit Water Still can be wall or bench mounted. Select

a convenient location which has access to the following

services:–

Electricity Supply

Before connection please ensure that the line supply is

suitable. The Merit Water Still W4000 is suitable for supplies

rated at 3kW, 220-240V, 50/60Hz~ single phase.

W4000/Euro is suitable for supplies rated at 3kW, 200-240V,

50/60Hz~ single phase.

Water Supply

A cold water supply capable of providing a minimum flow

rate of 60 l/hr.

Drain

A waste water drain located below the level of the still so

that the drain pipe can fall away straight without kinks or

bends, to allow an unimpeded flow.

Reservoir

A distillate collection reservoir should be located beneath

the still.

Warranty

Bibby Sterilin Ltd warrants this instrument to be free from

defects in material and workmanship, when used under

normal laboratory conditions, for a period of two (2) years.

In the event of a justified claim Bibby Sterilin will replace any

defective component or replace the unit free of charge.

This warranty does NOT apply if damage is caused by fire,

accident, misuse, neglect, incorrect adjustment or repair,

damage caused by incorrect installation, adaptation,

modification, fitting of non approved parts or repair by

unauthorised personnel.

This Warranty does not include the heater element

which is only garanteed for up to 1000 hours in use.

Figure 2 Flange assembly

Bolts

Tapered

glass

tube

Metal

flange

Plastic

insert

Rubber

gasket

Heater