Figure 4, Figure 6, Figure 8 – Air King VAL36 Manuel d'utilisation

Page 3: Figure 7, Figure 5

Advertising
background image

SECTION 5

Attaching the Chimney

1. Mark the location for the vertical chimney bracket:

If using the upper chimney section: 9-3/4"

If not using upper chimney section: 15-3/4"

2. If installing onto drywall, drill holes into wall using a 3/16" drill bit. Install wall anchors

into the drilled holes (one for each hole). Secure bracket into place with (2) provided

#6 x 1" screws. If installing into other material (brick, cement, plaster, etc.) choose an
appropriate fastner capable of supporting the weight of the chimney (Figure 5).

3. Press in appropriate tabs on lower chimney section (section with vent holes). If

using the upper chimney, press in tabs in middle of the chimney (Position A), other-
wise press in tabs at top of the chimney (Position B). Press in tabs at the bottom of
the chimney so there is approximately 1/4" of clearance (Figure 6).

www.airkinglimited.com

6728025 Rev. E 7-10

3 of 12

Figure 4

Hot

(Black)

Neutral

(White)

Supply from home

From Hood

NOTE: If the top chimney section (included) will be installed, slide the top section inside

of the bottom section at this point.

3. Slide chimney in place so top tabs of the chimney are secured in place on the indents

of the vertical chimney bracket and the backside of the chimney fits between the hood

and the wall with the bottom tabs overlapping the back lip of the hood (Figure 7).

4. To install the upper section, mark the location of the included horizontal mounting

bracket using the bracket as a template. Make sure the bracket is level and in line

with the bottom section. The height will be dependent on your installation require-

ments. Make sure the slots in the side of the chimney will match the holes in the

mounting bracket. If installing onto drywall, drill holes into wall using a 3/16" drill bit.
Install wall anchors into the drilled holes (one for each hole). Secure bracket into
place with (2) provided #6 x 1" screws. If installing into other material (brick, cement,

plaster, etc.) choose an appropriate fastner capable of supporting the weight of the

chimney (Figure 8).

Figure 6

Hot

(Black)

Ground

(Green

or

Bare)

Wire

Compartment

Figure 8

A

A

B

B

Details of duct collar, ducting, and electrical have

been omitted from drawing for clarity purposes.

Figure 7

Mounting

Bracket

Neutral

(White)

Ground

(Green

or

Bare)

Side View

Vertical Chimney

Bracket

9-3/4"

or

15-3/4"

Details of duct collar, ducting, and electrical have

been omitted from drawing for clarity purposes.

Figure 5

Advertising
Ce manuel est liée aux produits suivants: